Image
 South house- ground floor - removal of existing plaster 

22.11.2024 and update

Image
 Previous week 18.11-22.11.2024) we          1. finalized the removal of the existing internal pointing of 1st floor north house            2. removed most parts of the existing plastering of ground floor north house Ground floor north:

15.11.2024 and update

Image
Previous week (11.11-15.11.2024) we                1. finished the demolition of the internal walls (both houses)                2. almost finished the removal of the existing pointing of north house bedroom (1st floor)                3. started removing the plastering of north house( ground floor) + south house                             (ground floor) Regarding next week (18.11-22.11.2024) we are planning to   continue the removal of the existing plaster and pointing of the ground floor of both houses

13.11.2024

Image
 Removal of internal pointing

12.11.2024

Image
 Internal Demolishion works continue..

08.11.2024 and update

Image
Previous week (06.11-08.11) we 1.        prepared the internal of the house for the removal/demolishing works  2.        removed the build in shelves/kitchen/cabinets/sanitare etc 3.        started demolishing the internal walls and removing the plaster from the internal part of the stone walls. Regarding the week (11.11-15/11) we will continue the internal demolitions and removals.

07.11.2024

Image
  Internal  Demolitions/removals

06.11.2024

Image
06.11.2024 Fridge and washing machine are safe in the small storage room