Previous week (11.11-15.11.2024) we 1. finished the demolition of the internal walls (both houses) 2. almost finished the removal of the existing pointing of north house bedroom (1st floor) 3. started removing the plastering of north house( ground floor) + south house (ground floor) Regarding next week (18.11-22.11.2024) we are planning to continue the removal of the existing plaster and pointing of the ground floor of both houses