22.11.2024 and update
Previous week 18.11-22.11.2024) we
1. finalized the removal of the existing internal pointing of 1st floor north house
2. removed most parts of the existing plastering of ground floor north house
Ground floor north:
Previous week 18.11-22.11.2024) we
1. finalized the removal of the existing internal pointing of 1st floor north house
2. removed most parts of the existing plastering of ground floor north house
Ground floor north: