20.12.2024 and update

Image
 Previous week (15.12.2024-20.12.2024) we 1. removed the existing plastering of 1st floor south house and continued removing the existing pointing.  2. cleaned the stones from previous layers of concrete (south house, groundfloor) The week after the Christmas vacation we have scheduled  1. finish the removal of the existing pointing of the 1st floor south house and  2. make progress on cleaning the existing painting of the stones of the 1st floor south house as well.

05.12.2024

Image
 Deep removal of existing pointing