Posts

Showing posts from January, 2026

30.01.2026

Image
 

28.01.2026

Image
Strengthening north house A small story about the 'hidden works' As Vangelis had described you the concept was to put steel rods inside the south-west and west facade of the north building. The process started by drilling those spots as the following  video Then the metal rods were placed inside the holes The visible result are those steel plates on the facades The next steps  are  repointing both facades (exterior &interior) Put a special strengthening mortar inside the wall where those small plastic pipes are (see 1st photo)  🙂

27.01.2026

Image
 Sound insulation and wooden plank ceiling south house Installation of Some door and window sills Stonework north house side

26.01.2026

Image
 

20.01.2026

Image
 Internal pointing north house Kitchen south

19.01.2026

Image
 Supporting timber beams between the existing beams

16.01.2026

Image
  Kitchen

15.01.2026

Image
 

13.01.2026

Image
 Stone work north house Sound proofing membrane south house& north house finished

09.01.2025

Image
 

08.01.2025

Image
 Start of kitchen counter Empty storage room-preparation for the pvs/battery room

07.01.2026

Image
 Happy New Year!