27.11.2025

Image
 North roof sand Samples steel beams South roof - varnish

25.11.2025

Image
 Sanding and varnish roof (more photos will be uploaded soon)

21.11.2025

Image
 Water proofing on walls North house drainage South house foundament position Concrete on pvs bases

17.11.2025

Image
 Leveling screed south house GF Connections Pointing

14.11.2025

Image
 Excavations, transport of debris and stones, Screed north ground floor

13.11.2025

Image
 

12.11.2025

Image
 Excavations- parking place Corrections plastering on top point

11.11.2025

Image
 Plaster repairs on top Pvs cables Pvs bases

06.11.2025

Image
 Electrical installations and connections to the pvs + Waterproofing north house 

05.11.2025

Image
Filling last concrete  layer in south bathroom Waterproof protection north gf bathroom 1st 1stlayer Filling connections on floors   Concrete work north foundation

04.11.2025

Image
  New wall- Stone work north house