31.01.2025 and update

Image
  purchase and delivery of lime stones for the reforming of openings (south house) sample of external pointing For the week 03-07.02.2025 we have planned to start the reforming of the openings of south house Stand by works depending on the weather conditions: external demolitions/excavations  concrete work for the road to the plot

24.01.2025 and update

Image
  20.01.2025-24.01.2025 we finished the removal of the existing pointing of south house. For the week 27-31.01.2025 we have planned to start the reforming of the openings of south house

22.01.2024

Image
 Removal of external pointing

17.01.2025 and update

Image
 Previous week (13.01.2025-17.01.2025) we removed the suspended ceiling of ground floor south house removed tiles and cement layer of ground floor north house- that will permit us to have a heighten space (new bathroom) started removing the external existing pointing made trials of cleaning the color of the stones (1st floor south house) For the week (20.01.2025-24.01.2024) and the the upcoming weeks we have planned  to focus on the external wall works on the south house - reforming openings and removal of existing pointing. We also have planned to start the demolishing of the immediate landscape.

10.01.2025 and update

Image
  Previous week (06.01.2025-10.01.2025) we finished the removal of the existing pointing of 1st floor south house For the week (13.01.2025-17.01.2025) we  have planned to start removing the exterior existing pointing make progress on cleaning the existing painting of the stones 1st floor south house