29.04.2025

Image
 Electrical works

28.04.2025

Image
 Electrical works  South house

14.04-25.04.2025 and update

Image
 Update:  We finished the maintenance of 2 openings We continued piping work (plumbing) We digged a bit more the level of ground floor north house (we needed the permission of the structural engineer to do that) We did some preparation work for the rest of the plumbing works.  **Unfortunately, we had to remove two plants (one is a rose plant) in front of the bathroom ground floor north house because some pipes of the bathroom will be placed and be hidden there. I am generally against destroying existing planting but that was unfortunately inevitable. I will personally replant two plants once the works are done (smiley) As I have already written to you, the work slowed down tha last period because we were waiting for the structural engineer's visit and his survey. I was afraid that his proposal - especially the idea of underpinning the south house would interrupt/cause damage to other works. Finally, following his visit to the building, our structural engineer informed us...

14.04.2025

Image
 Plumbing/drainage Openings

04.04.2025

Image
 Maintenance of existing openings (1/3) south house Work in progress Digging the floor level north house bathroom

02.04.2025

Image
 Plumping works start