28.01.2026

Strengthening north house

A small story about the 'hidden works'

As Vangelis had described you the concept was to put steel rods inside the south-west and west facade of the north building. The process started by drilling those spots as the following  video




Then the metal rods were placed inside the holes

The visible result are those steel plates on the facades






The next steps  are

 repointing both facades (exterior &interior)

Put a special strengthening mortar inside the wall where those small plastic pipes are (see 1st photo) 

🙂


Comments

Popular posts from this blog